Prestation St Maur

Turnkey service including removal, installation and supply of 3 M20-36/2 – 400m3/h at 85mCE – 132 kW in the Centre Val de Loire region. On-site anchoring and modification of the discharge pipe and compliance with suction interfaces. Thanks to Veolia for its confidence

Réhabilitation FO54

For a Communauté d’Agglomération in the Grand Est, Renovation of a Bergeron FO54 pump over 50 years old (flow rate 1,000m3/h at 104 mce). Objective: Replacement of all wearing parts, repair of mechanical and hydraulic clearances, return to original performance, supply and adaptation of a new 400kW engine and platform testing. Another great achievement by… Continue reading Réhabilitation FO54

24e Édition du carrefour de L’eau

Le Carrefour de l’Eau de Rennes 2023 ouvre ses portes ! We look forward to seeing you on stand 407 in Hall 8 over the two days (25 and 26 January). We look forward to meeting you!

Bergeron pump commissioning

Commissioning of a Bergeron SX122 unit after overhaul of the pump (5796m3/h at 60mCE) and motor (2000 kW / 5500V) in our Estrablin (38) workshop. Another great achievement! Well done to our teams! And thank you to Eau du Grand Lyon for its renewed confidence.

Bergeron pump renovation

After 50 years of operation, this Bergeron pump model SL57 (flow of 509 m3/h) has been renovated by our Peme-Gourdin service teams further request from one of our main customers at the East of France.
All wearing parts were replaced and the hydraulic and mechanical slack corrected. The cast parts were sanded and their surface restored with a special coating (which has a Sanitary Conformity Certification). We recover the machine’s performance at its original level.
100% achievement for the operator!